Dubai real estate · Direct with Imtiaz Get availability ↗

New Imtiaz commercial launch · Majan, Dubai

The Vaultby Imtiaz

Office & retail.
The Majan investment case.

Understand the local occupier case, the planned Latifa bint Hamdan corridor and your capital commitment, with Yosra Mezzi.

Office spaces fromAED 1.4MRetail spaces fromAED 2.4M
The Vault by Imtiaz, a glass-fronted commercial building in MajanThe Majan Edition · Artist’s impression
Commercial collection69 offices · 8 retail units
Starting office size700 sq.ft.
Payment plan50 / 50
Expected completionQ4 2028

01 / Dubai’s office market

Businesses are still opening.
Quality space remains tight.

Dubai’s office case starts with business activity and the workspace those businesses actually need. The 2026 evidence points to continued company formation, demand for higher-quality offices and limited near-term availability—even through a period of regional uncertainty.

Evidence reviewed 16 November 2026 / Reporting periods shown below

Licences and Chamber membership joins are different measures, cover different periods and must not be added together. Neither is a count of new office leases or a full-year 2026 incorporation total.

Business formation during uncertainty

New businesses continued to commit.

Dubai Chamber’s official April release highlighted businesses establishing themselves despite changing regional and global conditions. March’s membership additions provide a concrete example of activity continuing during that period.

Read Dubai Chambers’ announcement ↗
2,709New companies joined Dubai Chamber in March 2026 alone

These March additions form part of the year’s Chamber activity; they are not an extra total to add to the nine-month figure.

The demand side

More businesses.
A preference for better offices.

Emirates NBD Research reported in August that demand for Grade A offices exceeded available supply. Finance, technology, professional services and flexible workspace operators were leading demand, with some occupiers securing space before completion.

  • Business formation adds potential occupiers to the market.
  • Existing businesses also relocate, expand and upgrade.
  • Smaller-unit leasing activity makes the size and usability of a unit relevant—not just the building’s image.
Emirates NBD Research · 21 August 2026 ↗

The supply side

Availability takes time
to catch up.

~800,000 sq.ft.Grade A completions / H1 2026

Reported by Emirates NBD Research. This is newly delivered Grade A space during the half-year, not Dubai’s total existing office supply.

50,000 sq.ft.All-office completions / Q3 2026

Cushman & Wakefield Core reported limited quarterly delivery, with much of the upcoming 2026 space already pre-let. These figures cover different periods and office categories.

Cushman & Wakefield Core · 29 October 2026 ↗

Why Dubai needs more high-quality workspace

Space that supports
how businesses operate.

01 / Choice

Capacity businesses can use.

When suitable offices are heavily occupied, an expanding firm has fewer options. More usable space can give businesses room to establish, relocate or grow.

02 / Quality

Workplaces worth moving for.

Savills highlights preferences for modern amenities, connectivity and sustainability credentials. For a specific building, test layout efficiency, services, parking and management against those occupier requirements.

03 / Fit

The right size in the right place.

New businesses have different headcounts and operating models. Some need flexible space; others need a dedicated office. Company registrations are a demand indicator, not one office lease per business.

The 2028 investor lens

Today’s shortage.
Tomorrow’s competing supply.

Cushman & Wakefield Core expects deliveries to accelerate from 2027. Savills sees development activity increasing from 2028. An investment targeting Q4 2028 handover should account for both ongoing occupier demand and the new choices tenants may have by completion.

  • Competing buildingsCompare the local pipeline and expected delivery dates.
  • Quality of operationAssess management, ownership structure and operating costs.
  • Unit economicsUse Majan rental evidence and the selected unit’s costs.

Bringing the market case back to The Vault

Offices at The Vault start from 700 sq.ft., giving investors a smaller-unit option to assess alongside the broader leasing trend. Ask Yosra for the technical specifications, parking allocation and handover details, then compare them with a realistic occupier’s needs.

Citywide research provides market context. It does not establish The Vault’s Grade A classification, a Majan rental rate or a guaranteed leasing outcome.

Sources are linked beside the relevant figures. Research providers use different market coverage and definitions; the measures above are not a single combined dataset. H1 = January–June; Q3 = July–September. Full-year 2026 figures were not yet available at the review date.

02 / The investment case

Start with the occupier.
Then choose the unit.

Two commercial assets.
Two different demand drivers.

The Vault offers an off-plan entry into Majan’s commercial market. The investment question is who could use the space, how they reach it and what it costs to own through handover.

For offices, assess usable layouts and staff access. For retail, assess frontage and repeat local customers. The area’s changing road network is part of the case; the right unit and leasing terms are what make it work.

03 / The district & the catalyst

Why Majan.
Why the road story matters.

Majan is a mixed-use community along Sheikh Mohammed bin Zayed Road, near Global Village and IMG Worlds of Adventure. Its parks, homes and local amenities give a commercial investor a neighbourhood to understand, alongside the wider Dubai market.

The question is how a unit can serve that neighbourhood today—and how future access may widen its appeal.

The address & the local connection

Majan. The Latifa connection.

The continuous dark-blue line connects Majan’s local streets to the community feeder, then follows the western branch into Latifa bint Hamdan. The copper route shows the wider extension and road upgrades.

Compare with the official illustration ↓
Majan + Latifa bint Hamdan corridor
The Vault, Majan and the Latifa bint Hamdan corridor extension North-up orientation map. The Vault is in Majan. A continuous dark-blue line connects the local street network inside Majan with the community approach, continues south along the feeder, and turns west into Latifa bint Hamdan. The unselected eastern branch is muted like the surrounding local roads. Copper dashes trace extension and interchange works; solid copper follows existing eastern roads being upgraded toward D54 and Emirates Road. Community streets use simplified OpenStreetMap geometry; the feeder is cross-checked against the supplied corridor illustration. This is an indicative community connection, not a surveyed driving route or a confirmed driveway from The Vault. Al Barari LivingLegends MAJAN IMG Worldsof Adventure GlobalVillage Sheikh Mohammed bin Zayed Rd Sheikh Zayed bin Hamdan Emirates Road E311 D54 E611 Latifa bint Hamdan EXTENSION + ROAD UPGRADES Indicative alignment · In development TowardsAl Khail / Al Meydan Majan to LatifaVia the western joining branch N The Vault ↗BY IMTIAZ · MAJAN Orientation map · Not an engineering survey

Dark blue: Majan local streets → community approach → southbound feeder → western Latifa connection. The eastern spur is neutral background context, not part of the highlighted connection. Copper: the wider corridor works. Simplified roads and community outlines: © OpenStreetMap contributors. Not cadastral boundaries or a surveyed driving route.

The local link is the important part.

The blue line runs continuously from inside Majan through the community approach, down the feeder and west into Latifa—not the eastern fork towards E311. For The Vault, this is a neighbourhood-access connection to assess alongside the building’s own approach, parking and visitor arrangements.

Western section / extension
A new link beyond E311.

Extension and interchange works link the eastern approach with the wider Latifa corridor towards Al Khail and Al Meydan.

Eastern section / existing road
More capacity, not an entirely new road.

L&T describes widening the existing E311–E611 road from two to four lanes in each direction, alongside a new E311 interchange.

Majan → western Latifa connectionOther roads / eastern spurExtension / interchange worksExisting eastern road / upgradesThe Vault project pin

Indicative community streets from OpenStreetMap, with the feeder cross-checked against the official corridor illustration. The blue highlight is a neighbourhood connection, not a confirmed The Vault driveway, a declaration that it is all newly built, or a verified opening status. Use Google Maps for navigation. Reviewed 18 November 2026. Infrastructure schedules may change.

Why this connection matters for The Vault

Local access.
Wider business potential.

The investment relevance is how a commercial address works for its occupiers and customers. The Majan feeder shown in the official visual connects that local story with the wider Latifa corridor.

01 / Offices

More practical route choices.

Connections towards Al Khail Road and Al Meydan Street can make Majan more practical for staff, visiting clients and suppliers. Match that network access with the selected office’s parking and usable layout.

02 / Retail

A broader local catchment.

Better approaches can support convenient repeat visits from nearby residents and workers. At The Vault, frontage, visibility, visitor parking and the right business activity determine how that access converts into trade.

03 / Investment

Connectivity as part of the leasing case.

A better-connected neighbourhood may appeal to more occupiers as infrastructure develops. Test that opportunity against current Majan rents, competing supply, service charges and fit-out costs—not assumed returns.

Get The Vault access & unit brief ↗

Ask Yosra to compare available units, parking allocations and the building approach with your intended use.

View the full official illustration — including the blue Majan connection
Full official Latifa bint Hamdan corridor illustration, showing the small blue community branches from the Majan and Living Legends area into the main corridor
Full illustration supplied for this project update; matches the Dubai Media Office’s published corridor visual. Source: RTA / Dubai Media Office. It shows the wider scheme rather than a confirmed driveway or turn-by-turn route to The Vault.

Delivered access works / RTA · August 2024

Majan’s entrance has already been upgraded.

Separate works introduced reversible lanes and a signalised junction serving Majan and Al Barari from Sheikh Mohammed bin Zayed Road.

9 → 4.5 mins

Evening peak entry delay reported by RTA after those works. This is a historical result at the community entrances, not a travel time to The Vault.

Read RTA’s completed access update ↗

Contract awarded / Future infrastructure

The Latifa bint Hamdan Street extension.

RTA awarded the corridor contract in July 2026 and explicitly lists Majan among the communities it will serve. The planned connection extends across Dubai’s main road network.

Announced investmentAED 2bn
Corridor length12 km
RTA target completionEnd 2028

For Majan, the investment consideration is improved network access for occupiers and customers. The precise benefit to a unit depends on the completed feeder roads and its own building access.

RTA’s corridor announcement ↗

One corridor / Six key road connections

  1. Sheikh Zayed Road
  2. Al Khail Road
  3. Al Meydan Street
  4. Sheikh Mohammed bin Zayed Road
  5. Sheikh Zayed bin Hamdan Al Nahyan Street
  6. Emirates Road

Road connections named by RTA. Schematic sequence; not a navigation map or a confirmed entrance to The Vault.

July 2026Corridor contract awarded

RTA’s announced infrastructure programme.

End 2028 / RTA targetCorridor completion

A future access milestone to monitor.

Q4 2028 / Developer targetThe Vault completion

A separate delivery programme for the building.

The next investor conversation

Move from the area story
to a unit-specific case.

Ask Yosra to compare the available office and retail options against your intended use, budget and holding period.

  • Unit layout, frontage and parking allocation
  • Handover specification and expected fit-out spend
  • Service-charge information and rental comparables
  • Payment dates, completion assumptions and exit options
Discuss the Majan investment case with Yosra ↗

Area facts: Dubai Holding Community Management · Infrastructure: RTA, 27 August 2024 · RTA, 12 July 2026 · RTA project overview. Reviewed 16 November 2026.

The commercial implications above are an investment assessment, not a rental forecast or a promise of price growth. Road and building completion dates are targets for separate projects and may change.

04 / Capital commitment

Know the cash flow
before the commitment.

50% during construction.
50% on completion.

Office starting priceAED 1,400,000

Illustrative payments based on the starting price. Yosra will confirm the price and schedule for your selected unit.

Booking20%AED 280,000On booking
Instalment 15%AED 70,00015 March 2027
Instalment 25%AED 70,0001 August 2027
Instalment 35%AED 70,00015 December 2027
Instalment 45%AED 70,0001 March 2028
Instalment 55%AED 70,00015 June 2028
Instalment 65%AED 70,0001 September 2028
On completion50%AED 700,00015 December 2028

Starting prices and availability are subject to confirmation. Purchase fees and other applicable charges are additional.

05 / The asset

The space behind
the investment.

Explore the official brochure ↗

Beyond the workspace

Make room
for connection.

Shared spaces for welcoming clients, informal meetings and time between appointments.

Ground floor

Reception lobbyLobby lounge & café

Roof level

Lounge & pantry areaCoffee & relaxation loungeSocial loungeRecreation zone

The project film

Yosra Mezzi in a blue suit

06 / Your direct contact

The project.
The right guidance.

Yosra Mezzi

Senior Relationship Manager
Imtiaz Developments · Dubai

From comparing office and retail options to understanding availability and the payment schedule, speak directly with Yosra about your next move.

Arabic · French · English

Speak with Yosra on WhatsApp ↗

07 / Take the next step

Your next move
starts here.

Receive floor plans, current prices and available units directly from Yosra.

Prefer WhatsApp? Message Yosra ↗
Get availability ↗WhatsApp Yosra
Yosra MezziSpeak with me ↗
Yosra Mezzi

Your direct contact at Imtiaz

I’m Yosra.
Let’s talk.

Considering The Vault? Speak with me directly about available units, floor plans and your payment options.

Chat with Yosra on WhatsApp ↗Request a callback instead